On the Shepparton Line Upgrade in regional Victoria, a single Makinex Renewables Hybrid Power System at Tabilk saved 17,351 litres of diesel in seven months. That is about $48,000 in fuel at today's diesel prices and 46.9 tonnes of CO₂ emissions avoided, with reliable power for the site all the way through.
Here's how hybrid power helped one of Victoria's biggest regional rail projects cut costs and emissions.
The Shepparton Line Upgrade is a major Victorian and Australian Government investment in regional rail. It is part of the $4 billion Regional Rail Revival program, which has upgraded every regional passenger line in Victoria. Stage 3 upgraded close to 40 kilometres of track between Seymour and Shepparton, as well as signalling and stabling, so that the line can run nine weekday return services and faster journeys.
Tabilk, just outside Nagambie in the Goulburn Valley, sits in the middle of the corridor. The works there included level crossing upgrades on Avenel–Nagambie Road, Tabilk–Monea Road, Morgans Lane and Nagambie–Locksley Road.
Rail upgrades are delivered under tight possession windows and long construction blitzes. Site compounds and work fronts need dependable power day and night for site offices, lighting, tools, communications and amenities. Usually that means a diesel generator running 24/7, whatever the actual load.
That brings a familiar set of problems:
The rail contractor replaced the site's 45kVA diesel generator with a Makinex Renewables HPS45 Hybrid Power System.
The HPS45 combines 45kW of power output, 60kWh of lithium battery storage and 8kW of integrated solar in a single, transportable unit. Smart generator control means the generator only runs when it is needed.
Instead of a 45kVA generator idling all day and night, the HPS45 powers the site from its batteries and solar for most of the day. The generator becomes a backup that switches on only to recharge the batteries or meet short peaks in demand.
Over seven months on the Shepparton Rail Upgrade, the HPS45 delivered:
For a single unit at a single location, those savings are significant. Across the many compounds and work fronts on a project the size of the Shepparton Line Upgrade, the opportunity grows quickly.
Rail corridors are long, linear and often regional, so grid connections are rarely practical and fuel logistics add up quickly. A hybrid power system like the HPS45 gives rail contractors: